Skip to content
UiTMINPRESFaculty of Chemical Engineering
INPRES-06Case storiesRev 2026-10
Work with us

Drawing register · 13 sheets

  1. 01HomeThe group on one sheet
  2. 02AboutStory, timeline, lab life
  3. 03PeopleSeven chartered engineers
  4. 04ResearchSix areas across a plant
  5. 05IndustryServices, sites, clients
  6. 05BMajor hazardsQRA team, live risk demo
  7. 06Case storiesPETRONAS, pipelines, biochar
  8. 07Work with usHow an industry job runs
  9. 08PublicationsSearchable bibliography
  10. 09GrantsEvery funded project
  11. 10PostgraduateMSc and PhD study
  12. 11NewsSite log
  13. 12ContactEmail, map, specialists
On site for a CIMAH study, Venator
On site for a CIMAH study, VenatorCase 01 of 03

Case stories / 01

Five terminals in one year

In 2025 PETRONAS asked INPRES for CIMAH studies at five of its fuel and LPG terminals in Melaka, Terengganu, Johor, Perak and Sabah. It was the biggest single run of CIMAH work in the group’s history.

Client
PETRONAS Dagangan Berhad
Years
2025 to 2027
Sites
Kerteh, Terengganu
Pasir Gudang, Johor
Lumut, Perak
Sepanggar Bay, Sabah
Melaka MRC, Melaka
Next
GES Klang Terminal C3/C4 LPG, 2026
First CIMAH report
iSHARP, 2016

Malaysia’s CIMAH Regulations apply to any site holding enough of a hazardous substance to cause a major accident. A fuel and LPG terminal clears that bar easily. The operator has to show, in writing, what could go wrong, how bad it could get, and what stands in the way.

INPRES has written these reports since 2016, when the first went to iSHARP, a Blue Archipelago company handling chlorine. Over the next nine years the list grew to chlorine and chlor-alkali plants in Teluk Kalong, glove factories, semiconductor fabs in Kulim and bulk liquid terminals at Westport.

In 2025 PETRONAS Dagangan Berhad appointed the group for its terminals at Kerteh, Pasir Gudang, Lumut and Sepanggar Bay in Sabah. The Melaka MRC Fuel & LPG Terminal followed under a separate contract. Assoc. Prof. Ir. Dr. Azil Bahari Alias and Prof. Ir. Dr. Zulkifli Abd Rashid lead the work, as they have on almost every CIMAH job since the first.

Each terminal gets its own report. The method is shared, which is why five sites in one year was possible at all. A sixth LPG site, GES Klang Terminal’s C3/C4 facility, was signed in 2026.

N-01The numbers

5 PETRONAS terminals/4 states/RM 0.2M combined/70+ CIMAH entries on UiTM Expert since 2016